This Old Shack – April Update Video

As promised, here is the progress we made on the cabin this weekend. We got a lot done…. well more than usual. Not much wood split but we didn’t have the proper tools… My camping ax wasn’t cutting it. Literally.

We arrived to 10 inches of snow late Friday night after a late ferry ride, it was above freezing so it was pretty slushy. We didn’t have a cooler so it was nice to use the snow as our cooler the first night. It almost all melted by Sunday.

I also wired up a switch that will power 3 12 volt lights on the main level of the cabin. I only had 25 feet of wire so I stuffed it behind the insulation and then we put the paneling up. I’ll have to add a section for the lights and to the battery. Also I made a hidden battery box that will house our charge controller, combiner and battery for our solar power system. I probably shouldn’t share the location of that, even though I doubt the thieves are reading this….

Check out the video below, Nate is a character…